Illustrative image of a store renovated in phases behind a temporary dust wall while it stays open

Commercial · Renovations

Commercial renovations in Toronto

Renovations to offices, stores, restaurants and building common areas across the GTA, phased and scheduled so your business, your tenants and your customers keep moving.

Office fit-out≈ $204 per sq ftToronto average hard costs, Cushman & Wakefield 2026
Cost trend+3.5% year over yearNon-residential building costs, Statistics Canada Q2 2026
Permit reviewFrom 3 business daysToronto Express Service for eligible interior alterations
Noisy work7 AM – 7 PM weekdaysToronto Noise Bylaw; quieter work can run after hours

01 — Scope

Commercial renovation services

Renovating an occupied commercial space is a different job from building an empty one. Customers, staff and neighbouring tenants are still there, the building has rules, and every day of disruption costs money. As a commercial renovation contractor in Toronto, XBuilt plans the work in phases, protects the areas that stay open, and schedules disruptive work outside regular hours when the site requires it.

  • Office renovations and layout changes
  • Retail store remodels and refreshes
  • Restaurant renovations and front-of-house upgrades
  • Lobby, corridor and common-area upgrades
  • Interior demolition and dust-controlled phasing
  • Framing, drywall and T-bar ceilings
  • Flooring, tile and painting
  • Washroom renovations and accessibility upgrades
  • Electrical, plumbing, HVAC and data coordination
  • Doors, frames, hardware and millwork
  • Permit, inspection and design coordination
  • Deficiency completion and closeout

02 — Clients

Who we work for

01

Business owners and operators

Offices, clinics, stores and restaurants that need to stay open, or close for as few days as possible.

02

Property managers

Lobbies, corridors, washrooms and vacant suites upgraded around tenants who are still in the building.

03

Franchise and multi-unit operators

Remodels and refreshes repeated across locations to the same standard.

04

Landlords

Repositioning older suites so they lease faster and compete with newer space.

03 — Costs

How much does a commercial renovation cost in Toronto?

There is no single price per square foot for a commercial renovation. A paint-and-flooring refresh and a full gut of an office floor are both renovations. Public 2025–2026 data gives useful anchors: Cushman & Wakefield's 2026 guide puts the average Toronto office fit-out at about $204 per square foot in hard costs, and Turner & Townsend's 2025 GTA data spans $235 to $865 per square foot from medium to high quality.

Commercial renovation budget anchors (Toronto and Canada, 2025–2026 market data)
Type of workBasisMarket range
Office fit-out, Toronto averageHard costs per sq ft, including general conditions and contingency (Cushman & Wakefield, 2026)≈ $204 / sq ft
Office fit-out, medium qualityHard costs per sq ft, GTA (Turner & Townsend, 2025)$235 – $395 / sq ft
Office fit-out, high qualityHard costs per sq ft, GTA (Turner & Townsend, 2025)$475 – $865 / sq ft
Restaurant cosmetic refreshTotal budget; finishes, flooring, paint, lighting; existing kitchen stays (Kim Ecopak, 2025)$20K – $80K
Restaurant mid-range renovationTotal budget; partial kitchen, new flooring, HVAC (Kim Ecopak, 2025)$100K – $300K

Cost per square foot by type of space

Market range in Canadian dollars per sq ft. Hover a bar for details.

Sources: Kim Ecopak restaurant start-up cost guide (2025) for restaurants; Turner & Townsend Canada Market Intelligence cost data (2025) for offices, hard costs only, excluding HST, furniture, fees and permits.

Building permit fees for interior alterations

Permit fees are a small share of the budget, but they are easy to estimate. Toronto charges them per square metre of the area being renovated:

City of Toronto interior alteration permit fees (effective January 1, 2026)
OccupancyFee per m²200 m² (≈ 2,150 sq ft)500 m² (≈ 5,380 sq ft)
Group A, B and D (for example offices)$12.45$2,490$6,225
Group C, E and F (for example retail, industrial)$11.53$2,306$5,765

Phased renovation vs. full closure

Phased, while open

Revenue keeps flowing
  • Work split into zones; part of the space stays in use
  • Dust barriers, protected routes and clean-up every shift
  • Noisy work scheduled within bylaw hours or after closing
  • Longer overall schedule and more coordination

Full closure

Shortest schedule
  • Crews work the whole space at once
  • Simpler logistics and fewer protection measures
  • Lost sales or relocation costs while closed
  • Works best for small units or planned downtime

These are market ranges compiled from public 2025–2026 sources for the Toronto area, shown to help you plan. They are not XBuilt quotes. Every project is priced after a site visit and a review of your drawings.

04 — Budget

What drives the cost of a commercial renovation

Renovations carry costs that new fit-outs do not: working around people, and finding what is hidden behind existing walls and ceilings. These are the factors that usually move the budget most, ranked by their typical impact:

Very high typical impact

Depth of the renovation

Cosmetic finishes versus new layouts, washrooms and mechanical systems.

Very high typical impact

Electrical and mechanical changes

Electrical is the largest single trade in the 2026 Toronto office benchmark, at about $43 per sq ft.

High typical impact

Existing conditions

Older buildings hide outdated wiring, uneven floors and undocumented services.

High typical impact

Phasing and after-hours work

Working in zones, at night or on weekends adds shifts, protection and supervision.

Medium typical impact

Finish level

Standard finishes versus custom millwork, feature ceilings and specified materials.

Medium typical impact

Accessibility upgrades

Barrier-free washrooms, entrances and door hardware added during the work.

Lower typical impact

Permits and design fees

Drawings, engineering and City fees of $11.53 to $12.45 per m² of work area.

Open up before you commit. In an occupied building, a few small inspection openings in walls and ceilings before pricing can save weeks of surprises once demolition starts.
Older ceiling opened up revealing hidden conditions
Hidden conditions in older buildings are why renovations carry a contingency.

05 — Schedule

Phasing a renovation around your business

A renovation schedule has to answer two questions: which parts of the space can be closed, and when. We plan each phase with you before work starts, so staff and customers know where to go each week.

PHASE 01Site review and phasing planExisting conditions, operating hours and zones that must stay open.
PHASE 02Drawings and pricingDesign, engineering and a line-by-line price per phase.
PHASE 03PermitExpress Service from 3 business days. Other streams 15–30 business days.
PHASE 04Phased constructionZone by zone, with dust control and protected routes.
PHASE 05InspectionsBuilding and fire inspections per phase where needed.
PHASE 06TurnoverDeficiencies closed and each zone handed back clean.
When audible construction noise is not allowed in Toronto (Noise Bylaw)
DayRestricted hours
Monday to Friday7 p.m. to 7 a.m.
SaturdayBefore 9 a.m. and after 7 p.m.
Sunday and statutory holidaysAll day

Noise that is clearly audible during these times needs an approved noise exemption permit. Quieter interior tasks can often be scheduled after hours. Source: City of Toronto, Noise Bylaw (2026).

06 — Approvals

When a commercial renovation needs a permit in Toronto

Not every renovation needs a building permit, but most renovations that change a layout do. The City's own lists are a good first check, and zoning rules apply whether or not a permit is needed.

WorkBuilding permit?What to know
Adding or removing wallsYesIncludes changing room sizes or uses.
Installing or modifying heating or plumbingYesNew washrooms, sinks and HVAC changes fall here.
Change of useYesRequired even when no construction is proposed.
Demolition of part of a buildingYesCovers removing all or a portion of a building.
Replacing windows or doorsYesIn buildings other than detached, semi-detached or single-unit row houses.
Repairing or replacing plumbing fixturesNoLike-for-like replacement only.
Installing cabinetry and millworkNoElectrical or plumbing connected to it may still need approvals.
Express ServiceFaster reviewInterior alterations to offices, retail and restaurants with fewer than 30 seats, up to 600 m², with no change of use or patron area. Target: 3 business days.

The City's lists are not exhaustive, and the owner is responsible for compliance. Always confirm with Toronto Building before you start.

07 — How we work

Our commercial renovation process

Phasing a renovation in an occupied space

Phasing a renovation in an occupied space. Illustrative plan: one zone under construction behind hoarding, the next zone waiting, and the rest of the space open to customers and staff.
Illustrative plan: one zone under construction behind hoarding, the next zone waiting, and the rest of the space open to customers and staff.
  1. Estimate and site review

    We walk the space during operating hours, see how it is used, and price the work line by line.

  2. Phasing and permits

    We agree the phases and work hours with you and the landlord, coordinate designers and manage the permit.

  3. Construction

    Our management team supervises the site, keeps protected areas clean and coordinates every trade.

  4. Inspections

    We book and attend building and fire inspections and close out any comments quickly.

  5. Turnover

    Each phase is handed back clean, with deficiencies completed before we move on.

Dated commercial interior before renovation
Stage 1Before
Temporary hoarding protecting an occupied building during after-hours renovation
Stage 2Behind the hoarding
Renovated commercial space reopened
Stage 3Reopened

08 — Our work

Recent renovation projects

See all projects →

09 — FAQ

Commercial renovation FAQ

How much does a commercial renovation cost in Toronto?

It depends on the type of space and how much changes. Turner & Townsend's 2025 data for the GTA puts a medium-quality office fit-out at $235 to $395 per square foot and a high-quality one at $475 to $865, in hard costs only. Cushman & Wakefield's 2026 guide puts the average Toronto office fit-out at about $204 per square foot. For restaurants, a cosmetic refresh often runs $20,000 to $80,000 and a mid-range renovation $100,000 to $300,000.

Do I need a permit to renovate a commercial space in Toronto?

You need a building permit to add or remove walls, install or modify heating or plumbing, replace windows or doors in a non-residential building, demolish part of a building, or change the use of a space. Repairing or replacing plumbing fixtures and installing cabinetry and millwork do not need a permit. Zoning rules still apply either way.

Can you renovate my space while my business stays open?

Often, yes. We split the work into phases so part of the space keeps operating, protect the occupied areas from dust and noise, and schedule disruptive work outside regular hours when the client, the landlord or the site requires it.

What hours is construction allowed in Toronto?

Under Toronto's Noise Bylaw, construction noise that is clearly audible is not allowed from 7 p.m. to 7 a.m. on weekdays, before 9 a.m. and after 7 p.m. on Saturdays, and all day on Sundays and statutory holidays, unless a noise exemption permit is approved. Quieter interior work may be possible outside those hours.

How much are building permit fees for a commercial renovation in Toronto?

As of January 1, 2026, the City of Toronto charges $12.45 per square metre of work area for interior alterations in Group A, B and D occupancies, such as offices, and $11.53 per square metre for Group C, E and F occupancies, such as retail and industrial space.

Are construction costs still rising in 2026?

More slowly. Statistics Canada reported that non-residential building construction costs rose 1.4% in the second quarter of 2026 and 3.5% year over year. Cushman & Wakefield's 2026 guide shows the average Toronto office fit-out slightly down, from about $210 to about $204 per square foot, as lower mechanical and electrical costs offset increases elsewhere.

Sources

  1. Cushman & Wakefield — Office Fit-Out Cost Guide, Canada (2026)
  2. Turner & Townsend — Canada Market Intelligence cost data table (2025)
  3. Kim Ecopak — Restaurant startup costs in Canada (2025)
  4. Statistics Canada — Building construction price indexes, second quarter 2026
  5. City of Toronto — When do I need a building permit
  6. City of Toronto — Interior alterations (non-residential) application guide and 2026 fees
  7. City of Toronto — Express building permits
  8. City of Toronto — Building permit review streams
  9. City of Toronto — Noise Bylaw

Start your renovation

Let’s renovate
without
shutting down.

Tell us about the space, your operating hours and what has to stay open. We reply to qualified requests the same business day.

+1 (647) 398-9960 info@xbuilt.ca
Your request goes directly to info@xbuilt.ca.