Illustrative render of a renovated open-concept kitchen and living area with an island and large windows

Residential · Renovations & Additions

Home Renovations & Additions in Toronto

Full renovations, additions and structural work for homeowners and property investors across the GTA, managed by one general contractor from the first estimate to the final walkthrough.

Full renovation$200K – $600KMid-range Toronto house, 2026 market range
Home addition$100K – $600K+Toronto market range, 2026, by size and structure
Permit review10 business daysCity of Toronto House stream, complete applications
Project sizeMedium to largeFull renovations and additions, no handyman work

01 — Scope

Home renovation contractor services in Toronto

A full renovation or an addition touches almost every part of a house: structure, plumbing, electrical, heating, finishes and, often, the permit file at City Hall. As your home renovation contractor in Toronto, XBuilt manages the whole job as general contractor, so you deal with one team and one schedule instead of a list of separate trades.

Where a full home renovation happens

Where a full home renovation happens. Illustrative section of a Toronto house: kitchen, bathrooms, basement, addition and structural work, coordinated by one general contractor.
Illustrative section of a Toronto house: kitchen, bathrooms, basement, addition and structural work, coordinated by one general contractor.

Our residential division is built for medium-to-large projects. We focus on full renovations and additions; we don't take on small repairs or handyman work. That lets us give every project the same hands-on management our commercial clients get: estimating, planning, daily site supervision, inspections and a clean turnover.

  • Full home renovations and whole-floor gut renovations
  • Kitchen renovations, including layout changes and new services
  • Bathroom and ensuite renovations
  • Basement renovations and secondary suite conversions
  • Home additions: rear, side and second-storey
  • Structural renovations: wall removals, new openings, beams
  • Framing, drywall and painting
  • Flooring and tile throughout the house
  • Finish carpentry and millwork installation
  • Electrical, plumbing and HVAC coordination
  • Exterior improvements as part of a larger renovation
  • Architectural, engineering, permit and inspection coordination
Illustrative image of a renovated primary bathroom with walk-in glass shower

02 — Clients

Who we build for

01

Homeowners planning a full renovation

Families updating an older Toronto house top to bottom, or renovating several rooms at once, who want one contractor accountable for the whole job.

02

Homeowners adding space

Rear, side and second-storey additions for households that would rather build than move, coordinated with your architect and engineer.

03

Investors and landlords

Full-unit renovations between tenancies and basement secondary suites, built to permit so the unit can be rented legally.

04

Buyers of older homes

New owners who want structural, kitchen, bathroom and basement work done before they move in, on a schedule tied to their closing date.

03 — Costs

How much does a home renovation cost in Toronto?

Public 2026 market data puts a mid-range full house renovation in Toronto at $200,000 to $600,000, with full gut renovations of older detached homes reaching $750,000 to $1,500,000 or more. Single rooms cost less, but kitchens, bathrooms and basements still vary widely with scope. The table and chart below compare the most common residential projects.

Home renovation budget by project type (Toronto, 2026 market ranges)
ProjectWhat it usually includesMarket range
Bathroom, mid-range fullNew fixtures, tile, vanity, lighting and ventilation in a full bathroom.$30K – $50K
Kitchen, mid-rangeNew cabinets, counters, appliances, flooring and lighting. High-end custom kitchens start around $100K.$25K – $75K
Whole basement finishFraming, insulation, drywall, flooring and lighting, without structural or waterproofing work.$50K – $95K
Legal basement secondary suiteSeparate unit with kitchen, bathroom, egress and fire separation. Over $160K with underpinning.$90K – $140K
Home additionNew foundation or structure, roof tie-in, services and finishes.$100K – $600K+
Full house renovation, mid-rangeMost rooms renovated, updated systems and finishes throughout.$200K – $600K
Full gut renovation, older detached homeHouse taken back to the structure, new layout, systems and finishes.$750K – $1.5M+

Total budget by renovation type

Toronto market range in Canadian dollars. Hover a bar for details.

Sources: HomeStars, Toronto renovation cost guide and Toronto basement renovation cost guide (2026). Full gut renovations ($750K – $1.5M+) are left off the chart for scale.

Cost per square foot

Per-square-foot figures are useful for comparing scopes, but they hide the fixed costs of kitchens, bathrooms and structural work. Treat them as a first check, not a budget.

Renovation cost per square foot

Toronto market range, in Canadian dollars per sq ft

Basement figure excludes structural and waterproofing work. Sources: HomeStars, Toronto renovation and basement renovation cost guides (2026).

Basement finish vs. legal secondary suite

For owners and investors, the basement is often the biggest decision. A finished basement adds living space; a legal suite adds a rentable unit, but needs a permit and more work.

Standard basement finish

$50K – $95K
  • Extra living space for the household
  • No permit if there is no structural, plumbing or new-unit work
  • About $65 – $130 per sq ft for a standard finish
  • Adding a bathroom with no rough-in adds about $8K – $15K

Legal secondary suite

$90K – $140K
  • A second unit you can rent legally
  • Building permit required, with drawings and plumbing data
  • Over $160K when underpinning is needed
  • Central Toronto rents of about $2,300 – $3,500 a month

These are market ranges compiled from public 2026 sources for the Toronto area, shown to help you plan. They are not XBuilt quotes. Every project is priced after a site visit and a review of your drawings.

04 — Budget

What drives the cost of a home renovation

Two houses on the same street can have very different renovation budgets. These are the factors that usually move the number most, ranked by their typical impact:

Very high impact (typical)

Scope and square footage

A single room, a full floor, a gut renovation or new space added to the house.

Very high impact (typical)

Structural work and underpinning

Removing walls, new beams and foundations. Underpinning a low basement adds about $30K – $80K or more.

High impact (typical)

Finish level and cabinetry

Custom cabinetry runs about $500 – $1,200 per linear foot, against $200 – $400 for semi-custom.

High impact (typical)

Age and condition of the house

Older Toronto homes often hide outdated wiring, plumbing and framing that has to be brought up to code once walls are open.

Medium impact (typical)

Moving plumbing and services

Relocating kitchens and bathrooms, or adding a basement bathroom with no rough-in ($8K – $15K).

Medium impact (typical)

Waterproofing and moisture

Basement waterproofing typically adds about $5K – $10K before any finishing starts.

Lower impact (typical)

Permits and drawings

City fees, design and engineering. Toronto charges $18.56 per m² for house additions and $13.41 per m² for residential alterations in 2026.

Decide the scope before you price it. The biggest budget swings come from changes made after construction starts. Settling layout, structure and finishes with your designer first gives you a price you can rely on.
Structural steel beam installed during a home renovation
Structural work and underpinning move residential budgets more than finishes do.

05 — Schedule

How long does a renovation or addition take?

The length of a residential project depends on its scope, the permit path and how complete the drawings are when construction starts. Most delays happen before the first wall comes down, which is why we plan the permit file and the trades together.

PHASE 01Site visit and budgetExisting conditions, scope and a realistic budget for the work you want.
PHASE 02Design and drawingsArchitectural and structural drawings coordinated with your designer.
PHASE 03Zoning and permitZoning certificate first, then the building permit application.
PHASE 04ConstructionDemolition, structure, rough-ins, insulation, drywall and finishes.
PHASE 05InspectionsCity inspections booked at each required stage of the work.
PHASE 06TurnoverDeficiencies closed and the house handed back clean.
City of Toronto permit review targets for residential work (2026)
Review streamTypical residential workReview target
Express ServiceInterior alterations, decks and porches, basement walkouts or underpinning, 1 to 2 unit conversions3 business days
House streamNew or existing detached and semi-detached houses and existing row houses with up to two units, including additions10 business days
Small Building streamPart 9 buildings other than houses15 business days

Targets apply to complete applications only. An application without an issued Zoning Applicable Law Certificate is incomplete, and the City sets no review time frame for incomplete applications. Source: City of Toronto, building permit review streams.

06 — Approvals

Renovation permits in Toronto

Not every renovation needs a building permit, but most full renovations and every addition do. We coordinate the application with your designer and engineer so the drawings go in complete and the inspections are booked in the right order.

WorkPermit?What to know
AdditionsYesIncludes second and third storey additions, attached garages, sunrooms and porches. 2026 fee: $18.56 per m² of floor area.
Structural alterationsYesAdding or removing walls, new window or door openings, or enlarging existing ones.
Heating and plumbing changesYesModifying heating or plumbing systems. Replacing plumbing fixtures or a furnace does not need a permit.
Basement workDependsA permit is needed for structural work, plumbing or heating changes, underpinning, a new entrance or a second suite. A simple finish without these does not.
Kitchen cabinets and millworkNoInstalling cabinetry and millwork is exempt, but moving plumbing or walls during a kitchen renovation is not.
Rental Renovation LicenceLandlordsRequired when a landlord issues an N13 notice for work that needs the unit vacated. Apply within seven days of the notice; $728 per unit in 2026.

Even when no permit is needed, the work must comply with the Zoning By-law. Requirements change, so always confirm with the City of Toronto before you apply.

07 — How we work

Our home renovation process

  1. Estimate and site visit

    We walk the house with you, review drawings if you have them, and price the work line by line.

  2. Design and permits

    We work with your architect or our design partners, coordinate engineering, and manage the zoning and permit applications.

  3. Construction

    Our management team supervises the site and coordinates every trade, with regular updates so you always know what comes next.

  4. Inspections

    We book and attend City inspections and close out any comments quickly so the schedule keeps moving.

  5. Turnover

    Deficiencies are completed, the house is cleaned, and you get a final walkthrough before handover.

XBuilt carries commercial general liability insurance and is WSIB compliant, and our management team brings 15+ years of construction experience to every project.

House interior gutted to the studs
Stage 1Gutted
New steel beam, insulation and rough-ins during a home renovation
Stage 2Rough-ins and drywall
Finished renovated home interior
Stage 3Finished home

08 — Our work

Our projects

Our residential portfolio is being added to the site. In the meantime, you can see how we manage construction, from framing and finishes to site supervision and closeout, on our projects page.

09 — FAQ

Home renovation FAQ

How much does a full home renovation cost in Toronto?

HomeStars' 2026 Toronto guide puts a mid-range full house renovation at $200,000 to $600,000, and a full gut renovation of an older detached home at $750,000 to $1,500,000 or more. Home additions range from $100,000 to $600,000 or more. The size of the house, structural work and finish level move the number most.

Do you take on small repairs or handyman jobs?

No. We focus on medium-to-large residential projects: full renovations, additions, structural work and complete kitchen, bathroom or basement renovations. We don't take on small repairs or handyman work, so we can give each project the planning and site supervision it needs.

Do I need a building permit to renovate my house in Toronto?

You need a permit for additions, adding or removing walls, new or enlarged window and door openings, changes to heating or plumbing, underpinning, a new basement entrance and a second suite. Installing kitchen cabinets, replacing plumbing fixtures or finishing a basement with no structural, plumbing or new-unit work generally does not need one. Zoning rules still apply either way.

How long does a permit for a house renovation or addition take in Toronto?

The City of Toronto reviews complete House stream applications within 10 business days. Smaller residential work such as interior alterations, basement walkouts and underpinning can qualify for Express Service, with a 3 business day review target. An application without an issued Zoning Applicable Law Certificate is incomplete and has no review time frame.

How much does a legal basement suite cost in Toronto?

HomeStars' 2026 Toronto data puts a legal secondary suite at $90,000 to $140,000, and over $160,000 when the basement needs underpinning. A standard basement finish without a new unit runs about $50,000 to $95,000 for the whole basement.

Can you work with my architect or designer?

Yes. We build from your architect's or designer's drawings, and if you don't have a designer yet, we work with a network of design partners so design and construction are coordinated from the start.

Sources

  1. HomeStars — How much do renovations cost in Toronto in 2026?
  2. HomeStars — Basement renovation cost in Toronto (2026)
  3. City of Toronto — Building permit review streams
  4. City of Toronto — When do I need a building permit
  5. City of Toronto — Building permit fees (2026)
  6. City of Toronto — Secondary suites application guide
  7. City of Toronto — Rental Renovation Licence: information for landlords

Start your renovation

Let’s build
your next
home project.

Tell us about the house, the scope and your timing. We reply to qualified requests the same business day.

+1 (647) 398-9960 info@xbuilt.ca
Your request goes directly to info@xbuilt.ca.