Commercial · Restaurant & QSR

Restaurant & QSR construction in Toronto

Fit-outs, renovations and new locations for restaurant operators and franchise brands across the GTA, built around the date you open your doors.

Market cost$150 – $600+ per sq ftToronto restaurant construction, by concept and finish level
Timeline10 – 24 weeksLease signing to opening, depending on the space
Permit reviewFrom 3 business daysToronto Express Service for eligible small restaurants
We handleEstimate to turnoverTrades, permits, inspections and deficiencies

01 — Scope

Restaurant construction services

A restaurant is one of the hardest interiors to build. It packs a commercial kitchen, customer seating, washrooms and brand finishes into a tight footprint, and it has to pass building, fire and public health inspections before the first customer walks in. XBuilt manages the whole build as your general contractor, so you deal with one team instead of a dozen trades.

  • Interior demolition and site preparation
  • Framing, drywall and bulkheads
  • T-bar, feature and wood-slat ceilings
  • Kitchen-grade flooring and wall tile
  • Millwork coordination and installation: counters, displays, banquettes
  • Washroom construction and accessibility upgrades
  • Electrical, plumbing and HVAC coordination, including kitchen exhaust
  • Data and low-voltage coordination for POS, menu boards and cameras
  • Doors, frames and hardware
  • Architectural, engineering, permit and inspection coordination
  • Painting, finishing and brand graphics installation
  • Deficiency completion and project closeout
Commercial restaurant kitchen line under construction

02 — Clients

Who we build for

01

Franchise owners and operators

Quick-service and fast-casual locations built to brand drawings and standards, ready for the franchisor's opening inspection.

02

Multi-location brands

One contractor for new stores, remodels and refreshes, so every location is built the same way.

03

Independent restaurateurs

Full-service and casual dining fit-outs, from raw shell to finished dining room, with a budget you can plan around.

04

Landlords and property managers

Tenant improvements and food-court units delivered on the schedule in your lease.

03 — Costs

How much does a restaurant fit-out cost in Toronto?

Public 2025–2026 market data puts restaurant construction in Toronto at roughly $150 to $600 per square foot. Where a project lands in that range depends on three things: what the space was before you, how much kitchen you need, and the finish level the brand requires. The tables below compare the most common scenarios.

Restaurant fit-out budget by scope of work (Toronto, 2026 market ranges)
ScopeWhat it usually includesMarket range
Cosmetic refreshNew finishes, flooring, paint, lighting and minor millwork. The existing kitchen and hood stay.$20K – $80K
Mid-range renovationPartial kitchen rework, new flooring, HVAC upgrades and updated washrooms.$100K – $300K
Full build-out from raw shellNew kitchen exhaust, full mechanical, electrical and plumbing rough-in, washrooms, finishes and millwork.$250K – $600K+

Total budget by scope of work

Market range in Canadian dollars. Hover a bar for details.

Sources: Kim Ecopak restaurant start-up cost guide (2025). Ranges exclude kitchen equipment, furniture and opening inventory.

Cost per square foot by restaurant concept

ConceptTypical cost per sq ftExample
Quick-service (QSR)From about $150Counter service, compact kitchen, durable finishes
Casual and full-service dining$150 – $600A 1,200 sq ft casual restaurant: about $180K – $720K in construction
Fine dining and high-end$500+Custom millwork, premium finishes, larger kitchen line

Main trade costs per square foot

Mechanical, electrical and plumbing work is where restaurants differ most from a standard retail unit. These are the three line items to watch:

Trade costs per square foot

Toronto market range, in Canadian dollars per sq ft

Additional fixed items: ventilation and exhaust hoods from $2,000 to $30,000, and kitchen fire suppression from $2,000 to $5,000. Source: CHI Real Estate, Toronto restaurant start-up costs (2026).

Second-generation space vs. raw shell

Second-generation restaurant space

Save $50K – $150K
  • Kitchen exhaust, grease interceptor and gas may be reusable
  • Electrical service often already sized for a kitchen
  • Faster permits when use and patron area stay the same
  • Existing systems must be inspected before you rely on them

Raw shell or non-restaurant unit

Full build-out
  • New exhaust, make-up air and fire suppression
  • New plumbing and possibly a grease interceptor
  • Electrical and gas service upgrades are common
  • Total freedom on layout and kitchen line

These are market ranges compiled from public 2025–2026 sources for the Toronto area, shown to help you plan. They are not XBuilt quotes. Every project is priced after a site visit and a review of your drawings.

04 — Budget

What drives the cost of a restaurant build-out

Two restaurants of the same size can differ in cost by hundreds of thousands of dollars. These are the factors that usually move the budget most, ranked by their typical impact:

How a commercial kitchen exhaust system works

How a commercial kitchen exhaust system works. Kitchen exhaust is usually the biggest mechanical item in a restaurant build-out: hood, fire suppression, a sealed grease duct to the roof, an exhaust fan and make-up air all have to work together.
Kitchen exhaust is usually the biggest mechanical item in a restaurant build-out: hood, fire suppression, a sealed grease duct to the roof, an exhaust fan and make-up air all have to work together.
Very high impact

Kitchen exhaust and ventilation

Hood size, duct run to the roof, make-up air and fire suppression.

Very high impact

Condition of the space

A second-generation restaurant versus a raw shell or a former retail unit.

High impact

Plumbing and grease interceptor

Floor drains, sinks, washrooms and trenching through an existing slab.

High impact

Brand standards and finish level

Custom millwork, feature ceilings and specified materials.

Medium impact

Electrical capacity

Panel upgrades for cooking equipment, coolers and signage.

Medium impact

Washrooms and accessibility

Barrier-free washrooms and entrances required by the Building Code.

Medium impact

Schedule and site access

After-hours work, mall or food-court rules and tight opening dates.

Lower impact

Permits and design fees

Drawings, engineering and municipal fees, plus a 15–20% contingency.

Plan a contingency. Industry guidance for Toronto restaurant openings recommends setting aside 15–20% of the budget for unexpected conditions, especially in older buildings where walls and ceilings hide surprises.
Kitchen exhaust hood and grease duct being installed
Kitchen exhaust is usually the single biggest mechanical cost in a restaurant.

05 — Schedule

How long does a restaurant build-out take?

Most of the schedule is decided before construction starts. Clean drawings and a complete permit application save more time than any crew on site.

PHASE 01Site review and budgetExisting conditions, scope and a schedule built backwards from opening day.
PHASE 02Design and drawingsArchitectural, mechanical and kitchen layouts coordinated.
PHASE 03PermitsExpress Service from 3 business days. Other restaurant permits typically 4–7 weeks.
PHASE 04ConstructionDemolition, rough-ins, ceilings, finishes and millwork.
PHASE 05InspectionsBuilding, fire and public health approvals.
PHASE 06TurnoverDeficiencies closed, equipment set, ready to open.
Typical time from lease signing to opening (Toronto)
Project typeTypical timeline
Quick-service refresh in an existing food space10 – 14 weeks
Full-service restaurant14 – 18 weeks
Bare shell or heavy-ventilation build18 – 24 weeks

Each permit resubmission can add two to three weeks. Source: CHI Real Estate, Toronto restaurant permits guide (2026).

06 — Approvals

Restaurant permits and approvals in Toronto

Permits are where restaurant schedules slip most often. We coordinate the applications with your designers, so drawings go in complete and inspections are booked in the right order.

ApprovalIssued byWhat to know
Building permitToronto BuildingRestaurants are assembly occupancies, so drawings need licensed design professionals. Review targets are 20 business days for large buildings and 30 for complex ones.
Express ServiceToronto BuildingFor interior alterations to restaurants with fewer than 30 seats, up to 600 m², with no change of use or patron area. Target review: 3 business days.
Food premises approvalToronto Public HealthFood premises must meet O. Reg. 493/17. Washroom changes need written approval from a public health inspector.
Business licenceMunicipal Licensing & StandardsEating or drinking establishment licence, about $537 to apply. A zoning review comes first.
Liquor licenceAGCOTypically four to six months from application to approval. Plan it in parallel with construction.

Requirements change. Always confirm with the City of Toronto before you apply.

07 — How we work

Our restaurant construction process

  1. Estimate and site review

    We walk the space, review your drawings and brand standards, and price the work line by line.

  2. Planning and permits

    We coordinate architects, engineers and your kitchen supplier, and manage the permit application.

  3. Construction

    Our management team supervises the site daily and coordinates every trade to protect the schedule.

  4. Inspections

    We book and attend building, fire and health inspections, and close out any comments quickly.

  5. Turnover

    Deficiencies are completed and the space is handed over clean and ready for your opening team.

Restaurant unit after demolition with plumbing trenches in the slab
Stage 1Demolition and rough-in
Restaurant build-out with framing, ductwork and tile in progress
Stage 2Build-out
Finished restaurant dining room and open kitchen ready to open
Stage 3Ready to open

08 — Our work

Recent restaurant projects

See all projects →

09 — FAQ

Restaurant construction FAQ

How much does a restaurant fit-out cost in Toronto?

Public 2025–2026 market data puts Toronto restaurant construction at roughly $150 to $600 per square foot. A cosmetic refresh of an existing restaurant often lands between $20,000 and $80,000, a mid-range renovation between $100,000 and $300,000, and a full build-out from a raw shell between $250,000 and $600,000 or more. Kitchen exhaust, plumbing and the condition of the space move the number most.

How long does a restaurant build-out take in Toronto?

From lease signing to opening, a quick-service refresh in an existing food space typically takes 10 to 14 weeks, a full-service restaurant 14 to 18 weeks, and a bare-shell or heavy-ventilation build 18 to 24 weeks. Each permit resubmission can add two to three weeks.

Do I need a building permit to renovate a restaurant in Toronto?

Most restaurant fit-outs need a building permit from Toronto Building. Interior alterations to restaurants with fewer than 30 seats, up to 600 square metres, with no change of use or patron area, may qualify for Express Service, which aims to review eligible applications within 3 business days. Larger projects go through the regular review streams.

Is a second-generation restaurant space cheaper to build out?

Usually. Taking over a space that was already a restaurant can reduce build-out costs by about $50,000 to $150,000 compared with a raw space or a non-restaurant unit, because exhaust, plumbing and electrical service may be reusable. The existing systems still need to be inspected before you rely on them.

Can XBuilt work outside business hours or around an operating store?

Yes. Our office hours are Monday to Friday, 8:00 AM to 5:00 PM, but site work can be scheduled outside regular hours when the client, the landlord or the site requires it.

Do you build to franchise brand standards?

Yes. We build quick-service and franchise locations to the brand's drawings and standards, coordinate with the franchisor's design team and suppliers, and are set up for operators who need the same contractor across multiple locations.

Sources

  1. CHI Real Estate — Startup costs for opening a restaurant in Toronto (2026)
  2. CHI Real Estate — Toronto restaurant permits guide (2026)
  3. Kim Ecopak — Restaurant startup costs in Canada (2025)
  4. Toast — How much does it cost to open a restaurant in Toronto (2026)
  5. City of Toronto — Building permit review streams

Start your restaurant project

Let’s build
your next
restaurant.

Tell us about the space, the brand and your opening date. We reply to qualified requests the same business day.