Restaurant front counter during final cleanup at the end of a commercial fit-out

Contractor insurance in Ontario: what your commercial GC should carry

Before a contractor sets foot in your space, you should know which policies protect you, which ones protect them, and what happens if something goes wrong between the two.

Key takeaways

  • Contractor insurance in Ontario starts with commercial general liability (CGL), automobile liability and property (builder's risk) coverage for the work itself.
  • The CCDC 41 insurance schedule that accompanies CCDC 2 (2020) sets CGL and auto minimums of $10,000,000 per occurrence and builder's risk at 1.1 times the contract price.
  • WSIB coverage is mandatory for most people who own or run a construction business, and a clearance certificate protects you from the contractor's unpaid premiums.
  • Insurance pays for accidents. A surety bond protects you if the contractor fails to finish or fails to pay its trades.

01 — The risk

Why contractor insurance matters to the owner

A renovation puts a crew, tools and temporary work inside a building you own or lease. If a worker damages the neighbouring unit, a visitor is injured, or a fire starts in the work area, someone has to pay. Contractor insurance in Ontario is how that cost gets moved away from you, but only if the right policies are in place, with the right limits, and with you named where you should be.

Most commercial owners never read a policy. They do not need to. What they need is a short list of coverages to ask for, a sense of the limits that are normal on standard Canadian contracts, and a way to check that the paperwork is current. Landlords usually ask for the same thing in the lease, so getting it right early also avoids delays at the start of a tenant improvement project.

This article is general information for business owners, not legal or insurance advice. Coverage depends on the actual policy wording. Confirm requirements for your project with your insurance broker and lawyer.

02 — Coverage

The core policies a commercial contractor should carry

In Canada, most commercial projects use contracts from the Canadian Construction Documents Committee (CCDC). The standard stipulated-price contract, CCDC 2 (2020), is paired with an insurance schedule called CCDC 41. Even if your project uses a different contract, those minimums are a useful benchmark for what a serious commercial contractor is expected to carry.

Main contractor coverages and CCDC 41 minimums (CCDC 41 with CCDC 2, 2020 edition)
CoverageWhat it protectsCCDC 41 minimum
Commercial general liability (CGL)Amounts the contractor is legally obliged to pay for bodily injury or property damage to others, including after the work is complete.$10M per occurrence
Automobile liabilityInjury and damage caused by the contractor's owned or leased vehicles.$10M per occurrence
Broad form property (builder's risk)Physical loss or damage to the work under construction.1.1 × contract price
Contractor's pollution liabilityClaims arising from pollution caused by the work.$5M per occurrence
Policy deductiblesThe amount paid before the insurer responds on CGL and property claims.Max. $10,000

Minimums from the CCDC 41 insurance requirements published with CCDC 2 (2020). Under the 2008 edition, CGL and automobile limits were $5,000,000 and pollution liability was not required (Cowan Insurance Group). Your contract can set different limits; small projects often use lower ones agreed with the owner.

Commercial general liability

The Insurance Bureau of Canada describes commercial liability insurance as coverage for amounts you are legally obliged to pay for bodily injury or property damage to others. For a contractor, that is the policy that responds when a ceiling grid falls on a customer or a water line floods the unit below. Two endorsements matter to owners:

  • Additional insured. You, and often your landlord, are added to the contractor's policy. The City of Toronto, for example, asks third parties working for its business improvement areas to list the BIA and the City as additional insureds.
  • Cross liability. The policy treats each insured as if separately insured, so one named party can claim against another. The City of Toronto asks for this clause as well.
  • Completed operations. Damage that shows up after turnover, such as a leak from a fitting, should still be covered.

Professional liability

The Insurance Bureau of Canada describes professional liability as coverage for damages and defence costs arising from professional negligence, for businesses paid to give professional services or advice. On a conventional project your architect and engineers carry it. On a design-build project, ask how the design side is insured, because the design-builder is responsible for the drawings as well as the construction.

03 — Property

Builder's risk vs. CGL: which policy pays?

Owners often assume one policy covers everything on site. It does not. In Pre-Eng v. Intact (2019 ONSC 1700), an Ontario court held that builder's risk coverage extends only to the portion of the property actually under construction, renovation or repair. When water from negligent roof work damaged a gym floor outside the work area, builder's risk did not pay; that kind of loss belongs to the contractor's CGL. The two policies are designed to work together.

Builder's risk (broad form property)

The work itself
  • Covers the portion of the property under construction
  • Fire, theft or water damage to new framing, finishes and installed equipment
  • Usually sized to the contract price; CCDC 41 asks for 1.1 times
  • Does not cover the rest of your building

Commercial general liability

Everyone else
  • Covers injury to people and damage to third-party property
  • Neighbouring units, existing finishes outside the work area, visitors
  • CCDC 41 minimum: $10,000,000 per occurrence
  • Name yourself and your landlord as additional insureds

Ask early who is buying builder's risk. Under CCDC contracts it is usually the contractor, but some owners and landlords insure the work themselves. Either way, the gap to watch is the area between "the work" and "the building", and your own property policy as a tenant or owner still matters.

04 — Workers

WSIB coverage and clearance certificates

Workplace injury coverage in Ontario comes from the Workplace Safety and Insurance Board (WSIB), not a private insurer. In construction it is mandatory for most people who own or run the business: independent operators, sole proprietors, and some partners and executive officers who work in construction. A business must register within 10 calendar days of hiring its first worker.

For you as the owner, the key document is the clearance certificate. According to WSIB policy in force since September 22, 2025, a clearance relieves the person paying for the work of liability for the contractor's unpaid WSIB premiums during its validity period. A clearance is valid for up to 90 days and covers all of the contractor's contracts, so on longer projects you need a renewed one. The WSIB asks principals and contractors to keep clearance records for at least three years. Householders who buy services from a contractor fall outside the policy; commercial owners and tenants do not.

We explain the process step by step in why you should ask for a WSIB clearance certificate.

05 — Security

Surety bonds: when insurance is not enough

Insurance pays for accidents. It does not pay if the contractor walks off the job or fails to pay its trades. That is what surety bonds are for:

  • Bid bond: protects the owner if the winning bidder refuses to sign the contract.
  • Performance bond: if the contractor defaults, the surety steps in to remedy it.
  • Labour and material payment bond: pays valid claims from subcontractors and suppliers the contractor fails to pay. These bonds are usually capped at 50% of the contract value.

Ontario's Construction Act requires a performance bond and a labour and material payment bond, each covering at least 50% of the contract price, on public contracts of $500,000 or more with the Crown, municipalities and broader public sector organizations. Private owners are not required to ask for bonds, but on a large fit-out it is reasonable to ask whether the contractor can provide them and what they would add to the price.

06 — Before you sign

How to check contractor insurance in Ontario before work starts

A short review at bid stage avoids a scramble when the landlord asks for paperwork the week before mobilization:

  1. Put the requirements in the tender

    List the coverages and limits you expect, or reference CCDC 41, and include your landlord's lease requirements.

  2. Ask for certificates, not promises

    Get a certificate of insurance showing insurer, policy numbers, limits, expiry dates and the additional insureds.

  3. Get a current WSIB clearance

    Download it yourself from the WSIB clearance lookup and diarize the renewal every 90 days.

  4. Confirm who insures the work

    Agree in writing who carries builder's risk, for what amount and with what deductible.

  5. Recheck at renewals

    Policies expire. Ask for updated certificates when a policy renews mid-project.

XBuilt carries commercial general liability insurance and is WSIB compliant, and we provide certificates and clearances at the start of every project. You can read more about our team, see how we approach commercial construction, or use our guide on how to choose a commercial general contractor in Toronto. When you are ready, request a quote and we will include our insurance documents with the proposal.

07 — FAQ

Contractor insurance FAQ

What insurance should a commercial contractor carry in Ontario?

At a minimum, commercial general liability, automobile liability and WSIB coverage, plus builder's risk (broad form property) for the work when the contract makes the contractor responsible for it. On projects using the CCDC 41 insurance schedule with CCDC 2 (2020), the minimums are $10,000,000 per occurrence for CGL and auto liability, builder's risk at 1.1 times the contract price, and $5,000,000 of contractor's pollution liability.

Does builder's risk insurance cover damage to the rest of my building?

Generally no. An Ontario court held in Pre-Eng v. Intact (2019) that builder's risk extends only to the portion of the property actually under construction or repair. Damage outside the work area caused by the contractor is a matter for its commercial general liability policy.

Is a WSIB clearance certificate the same as insurance?

No. WSIB coverage is Ontario's workplace injury system, and a clearance certificate shows the contractor is registered and up to date. It relieves you of liability for the contractor's unpaid WSIB premiums while it is valid, for up to 90 days, so it should be renewed on longer projects.

Sources

  1. CCDC 41 — CCDC Insurance Requirements, with CCDC 2 (2020)
  2. Cowan Insurance Group — CCDC 2 (2020) changes: is your construction insurance affected?
  3. Insurance Bureau of Canada — Types of business insurance coverage
  4. City of Toronto — BIA insurance coverage (additional insured and cross liability)
  5. Norton Rose Fulbright — Ontario court confirms limited scope of builder's risk insurance (2019)
  6. WSIB — Mandatory coverage in the construction industry
  7. WSIB — Operational Policy 14-02-04, Clearance Certificates (2025)
  8. WSIB — Clearances
  9. McMillan LLP — Performance bonds under section 85.1 of the Ontario Construction Act
  10. TDS Law — Surety bonding on construction projects: the basics (2023)

Start your project

Build with
a contractor
that's covered.