Key takeaways
- Shortlist a commercial general contractor in Toronto on relevant work first: restaurants, retail and tenant improvements each have their own risks.
- Verify the paperwork yourself: a current WSIB clearance, a certificate of insurance naming you, and, on larger work, a health and safety certification such as COR.
- Compare bids on scope, exclusions, allowances and schedule, not just the bottom line.
- Use a standard contract, such as CCDC 2, and know your obligations under Ontario's prompt payment and 10% holdback rules.
01 — The role
What a commercial general contractor actually does
A commercial general contractor in Toronto takes responsibility for building your project: hiring and scheduling the trades, buying materials, running the site, coordinating with your architect and engineers, booking inspections and handing the space over. On most fit-outs the general contractor is also the "constructor" under Ontario's health and safety law, which makes it responsible for safety on site and for filing a Notice of Project with the Ministry of Labour before work starts when labour and materials are expected to exceed $50,000.
That is a lot of responsibility, and contractors differ widely in how they handle it. Some are management firms that subcontract everything; others self-perform parts of the work. Some specialize in restaurants or retail, others in offices or industrial space. None of that is good or bad on its own. What matters is whether the firm has done your kind of project, in your kind of building, recently.
02 — Shortlist
Build a shortlist on relevant experience
Start with a short list of firms and ask each for a written qualification package. In Canada, many owners use the CCDC 11 Contractor's Qualification Statement, a standard form that covers company information, capacity, key personnel and project experience. It makes firms easier to compare because they all answer the same questions.
- Similar projects. A restaurant needs kitchen exhaust, grease and health-inspection experience; a mall unit needs a contractor who knows landlord criteria and night work.
- The people, not the logo. Ask who will run your job: the project manager and the site supervisor, and how many other sites they are running at the same time.
- Permit experience. Ask how they handle Toronto's zoning and permit steps and which review stream your project is likely to fall into.
- References you can call. Ask for owners or property managers from recent projects, and ask them about schedule and closeout, not just quality.
- Service area. A contractor based across the GTA can still serve you well, but confirm how often the supervisor will be on site.
03 — Due diligence
Verify the paperwork before you hire
Ask for documents, then check them yourself. This table lists what to request and where to confirm it.
| Document | Why it matters | How to verify |
|---|---|---|
| WSIB clearance certificate | While valid, it relieves you of liability for the contractor's unpaid WSIB premiums. | Look it up on the WSIB clearance site; valid up to 90 days. |
| Certificate of insurance | Shows CGL, auto and property coverage. CCDC 41 sets $10M per occurrence for CGL on CCDC 2 (2020) projects. | Check limits, expiry dates and that you and your landlord are additional insureds. |
| Health and safety certification | The City of Toronto requires COR certification, granted by IHSA, on its own construction contracts of all sizes. | Ask for the certificate, or the firm's written safety program on private work. |
| Notice of Project | Required before construction when labour and materials are expected to exceed $50,000. | Ask the contractor to confirm it will file and post it on site. |
| Bonding capacity | Public contracts of $500,000 or more need performance and payment bonds of at least 50% of the contract price. | On large private jobs, ask for a letter from the contractor's surety. |
Our articles on contractor insurance in Ontario and WSIB clearance certificates go deeper on the first two rows.
04 — Pricing
Compare bids like for like
Three bids for the same drawings can differ widely, and the lowest is often the one that left something out. Before you compare prices, line the bids up on the same scope.
Complete bid
Priced scope- Line items that match your drawings and specifications
- Clear exclusions and allowances
- Permit, inspection and closeout steps included
- A schedule that works back from your opening date
Lowest number only
Hidden gaps- Lump sum with little breakdown
- Low allowances that turn into change orders
- Mechanical, electrical or fire work "by others"
- No schedule or a vague start date
Ask every bidder the same clarification questions in writing and share the answers with all of them. If one bid is far below the rest, ask the bidder to walk you through it. Sometimes there is a good reason; often there is a missing scope item.
05 — Terms
Agree on the contract and the payment rules
Use a recognized contract rather than a one-page quote. For a fixed price on complete drawings, the standard Canadian form is CCDC 2, the stipulated price contract, in which the owner works with an architect on the design and then hires a general contractor to build it. If you want one firm to handle design and construction, read our comparison of design-build vs. design-bid-build.
Whatever the form, Ontario's Construction Act sets payment rules that apply to both sides:
- The owner pays a proper invoice within 28 days, or gives a notice of non-payment within 14 days.
- Since January 1, 2026, an invoice is deemed proper unless the owner objects in writing within 7 days.
- The owner retains a 10% holdback, which must now be released annually on contracts entered into from 2026.
- Payment disputes can go to adjudication for a quick, interim decision.
The details are in our guide to holdbacks and prompt payment in Ontario.
General information, not legal advice. Have your lawyer review the contract before you sign.
06 — Warning signs
Red flags when hiring a commercial general contractor in Toronto
- No WSIB clearance, or a promise to "send it later".
- An insurance certificate that has expired or does not name you.
- Reluctance to put the price, scope and schedule in a written contract.
- A large deposit requested before any work, materials or permits.
- Nobody named as project manager or site supervisor.
- No references from projects similar to yours.
XBuilt is a Toronto commercial construction contractor with a management team of 15+ years' experience, commercial general liability insurance and WSIB compliance. Our partners run projects hands-on, from estimating and planning through construction, inspections and turnover. Learn more about XBuilt, then request a quote and we will send our qualification documents with the proposal.
07 — FAQ
Choosing a contractor FAQ
How do I check if a contractor is registered with WSIB?
Ask for the contractor's clearance certificate and confirm it yourself on the WSIB clearance lookup. A clearance shows the business is registered and in good standing, and is valid for up to 90 days, so ask for a renewed one on longer projects.
Should I always choose the lowest bid?
Not without checking it. Compare bids on the same scope, exclusions, allowances and schedule first. A bid far below the others often leaves out work that comes back later as change orders.
What contract should I use with a commercial general contractor?
For a fixed price on complete drawings, the standard Canadian form is CCDC 2, the stipulated price contract. Other CCDC forms cover cost plus, unit price, construction management and design-build. Have a lawyer review the contract before you sign.
Sources
- Government of Ontario — File a work notice (Notice of Project)
- CCDC 11 (2019) — Contractor's Qualification Statement
- WSIB — Clearances
- WSIB — Operational Policy 14-02-04, Clearance Certificates (2025)
- CCDC 41 — CCDC Insurance Requirements, with CCDC 2 (2020)
- City of Toronto — Certificate of Recognition (COR) program
- McMillan LLP — Performance bonds under section 85.1 of the Ontario Construction Act
- Ontario Bar Association — Compare and contract: CCDC 2 and CCDC 5A (2023)
- Robins Appleby LLP via Mondaq — Key changes to Ontario's Construction Act (2026)
- McCarthy Tétrault — A primer on the amendments to Ontario's Construction Act (prompt payment)