Key takeaways
- In Ontario food premises, floors must be tight, smooth and non-absorbent; carpet is allowed in dining rooms only.
- Under ANSI A326.3, level interior floors that may get wet need a wet DCOF of 0.42 or more; kitchens call for O/G-rated products.
- For commercial LVT, ask for the wear layer: 20 mil for commercial use, 28 mil or more for heavy traffic.
- Resinous floors vary widely: from 2–5 years for thin-film epoxy to 12–18 years for urethane cement, per one manufacturer.
01 — Rules first
Start with the rules: health, slip and landlord criteria
Choosing between commercial flooring options for a store or restaurant starts with what you are not allowed to use. Three sets of rules narrow the list before taste or price come in.
Public health rules for food premises
Ontario's food premises regulation (O. Reg. 493/17), as summarized in 2026 public health guidance, requires floors and floor coverings to be made of a tight, smooth and non-absorbent material. Carpet is not allowed where food is handled, prepared, transported or stored, where utensils are washed, or in washrooms. It is allowed in the dining room only. For food preparation, storage and dishwashing areas, the guidance recommends fibreglass reinforced plastic, stainless steel or ceramic tile.
Landlord criteria
In malls and retail concourses, the landlord often decides too. One published Toronto criteria manual (2021, updated 2024) requires hard surfaces such as natural wood, stone or porcelain in the first 5'-0" behind the storefront, bans vinyl and sheet flooring in sales areas, and calls for a waterproof membrane under non-slip finishes in food court units. See mall tenant criteria packages, explained.
02 — Slip resistance
Slip resistance: what DCOF numbers mean
For hard flooring, slip resistance is measured as the dynamic coefficient of friction (DCOF). Under ANSI A326.3, level interior floors that may be walked on when wet should have a wet DCOF of 0.42 or more. The standard also groups products by where they can be used:
| Category | Meant for | Typical retail and restaurant areas |
|---|---|---|
| Interior Dry (ID) | Level areas expected to stay dry; dry DCOF of 0.42 or more | Showrooms, offices, lobbies without water sources |
| Interior Wet (IW) | Mostly dry areas that occasionally get wet; wet DCOF of 0.42 or more | Entrances, washrooms without showers, grocery stores, restaurant dining areas |
| Interior Wet Plus (IW+) | Interior areas often covered by standing water | Shower floors, locker rooms |
| Oils/Greases (O/G) | Higher wet DCOF and enhanced texture | Commercial kitchens |
Ask for the category on the product data sheet, not just the DCOF number, and match it to the zone. A tile that is right for the dining room may be wrong for the cook line.
03 — Options
Commercial flooring options compared
Each material has a different durability measure. Knowing which one to ask for is how you compare products fairly:
| Material | Durability measure to ask for | Good fit | Watch for |
|---|---|---|---|
| Porcelain or ceramic tile | ANSI A326.3 category and wet DCOF | Entrances, dining rooms, washrooms, kitchens with O/G-rated tile | Matching the slip category to each zone |
| Luxury vinyl tile (LVT) | Wear layer in mil: 20 for commercial, 28 or more for heavy traffic | Sales floors where the landlord allows vinyl | Thin wear layers; some landlords ban vinyl in sales areas |
| Resinous (epoxy, urethane cement) | System type and expected lifespan | Back-of-house, storage, kitchens | Thin-film epoxy can last as little as 2–5 years |
| Terrazzo | Repairability over decades | High-traffic common areas and entrances | Among the more expensive floors up front |
| Carpet | Weight, e.g. 32 oz minimum in one landlord's criteria | Retail sales areas; in restaurants, the dining room only | Not allowed in food handling areas or washrooms |
04 — Luxury vinyl
Luxury vinyl: buy the wear layer, not the look
LVT can look like wood or stone, but what decides its life in a busy store is the clear wear layer on top. A 2026 manufacturer guide puts it this way:
- 6–12 mil: light residential use
- 12–20 mil: active homes and light commercial
- 20 mil or more: commercial projects, and usually the minimum for a full commercial warranty
- 28 mil or more: heavy commercial, such as hospitality corridors and public areas
The same guide notes that a 12 mil floor can show visible wear in as little as two years in high-traffic common areas, and that the surface coating matters too: a 20 mil product with an aluminum oxide or ceramic bead coating may outperform a 28 mil product with a standard urethane finish. Ask for both numbers.
05 — Resinous floors
Resinous floors: the system matters more than the word "epoxy"
"Epoxy floor" covers products with very different lives. A flooring manufacturer's 2026 comparison gives these lifespans by system, adjusted for a dense urban market:
Expected lifespan by resinous floor system
Range in years. Hover a bar for details.
For a kitchen, back-of-house corridor or stockroom, ask which system is being quoted, how thick it is and what the manufacturer expects it to last. Two "epoxy" quotes can describe floors with very different lifespans. For warehouse and industrial slabs, see polished concrete vs. epoxy vs. sealed concrete.
06 — Long life
Terrazzo and other long-life floors
At the top of the durability scale, the National Terrazzo & Mosaic Association describes terrazzo as a floor that can be repaired and reused rather than replaced, and points to installations still in service after more than a century. The same publication is candid that terrazzo's first cost "can be among the more expensive flooring options," and argues that high-traffic carpet or vinyl may need replacing as often as every five years. For a retailer on a ten-year lease, the right answer depends on how long you will be in the space.
07 — Plan by zone
Pick a floor for each zone, not one for the whole store
- Entrance and landlord control zone: hard surfaces such as porcelain or stone, rated for wet use
- Sales floor: porcelain, or commercial LVT with a 20 mil or heavier wear layer where the landlord allows it
- Restaurant dining room: Interior Wet-rated tile or another tight, smooth, non-absorbent surface
- Kitchen and dishwashing: O/G-rated tile or a resinous system chosen for its lifespan
- Washrooms: Interior Wet-rated tile, no carpet
Flooring and tile are part of every XBuilt retail fit-out and restaurant build. Replacing floors in a store that has to stay open? Read how to renovate a store without closing, then request a quote with your floor plan and the landlord's criteria.
FAQ
Commercial flooring FAQ
What is the most durable flooring for a busy retail store?
It depends on the zone. Porcelain tile and terrazzo are long-life hard surfaces, and published landlord criteria call for hard surfaces in the storefront zone. Commercial LVT can work on sales floors where the landlord allows it, with a wear layer of at least 20 mil, or 28 mil or more for heavy traffic.
What slip resistance do restaurant floors need?
Under ANSI A326.3, level interior floors that may get wet should have a wet DCOF of 0.42 or more. Products rated Interior Wet suit restaurant dining areas and entrances, while commercial kitchens call for products rated for oils and greases.
Can a restaurant use carpet in Ontario?
Only in the dining room. Ontario public health guidance under O. Reg. 493/17 does not allow carpeting where food is handled, prepared, transported or stored, where utensils are washed, or in washrooms. Floors in those areas must be tight, smooth and non-absorbent.
Sources
- Windsor-Essex County Health Unit — Opening or renovating a food premises, O. Reg. 493/17 guidance (2026)
- Crossville — Porcelain tile DCOF ratings and applications, ANSI A326.3 (2025)
- MSI Surfaces — LVT wear layer thickness (2026)
- Duraamen Engineered Products — How long do commercial floor coatings last? Lifespan by system type (2026)
- National Terrazzo & Mosaic Association — Value in Terrazzo (posted 2024)
- Bay Adelaide Centre — Retail Tenant Design Criteria (2021, with 2023–2024 updates; posted 2025)
