Mall tenant criteria packages in Ontario, explained

The landlord's criteria package decides what your store can look like, who builds parts of it and what it costs before the first quote arrives. Here is how to read one.

Key takeaways

  • A tenant criteria package covers design criteria, technical criteria and construction rules.
  • Published Toronto examples limit storefront openings and signage to 40% and require hard surfaces in a control zone.
  • Sprinkler, fire alarm and base-building work often goes to the landlord's contractors, at the tenant's expense.
  • Deposits of 3% of construction value (capped at $10,000 in both examples) depend on closeout documents within 60 days.

01 — The basics

What is a tenant criteria package?

A tenant criteria package is the set of documents a landlord gives a retail or restaurant tenant before design starts. It tells you what your store may look like, how it connects to the building and how, when and by whom it can be built. In an Ontario mall or retail concourse, it often matters as much to your budget as the drawings do.

Most packages have three parts:

  • Design criteria: storefront, signage, finishes and ceilings, especially in the zone customers see from the common area
  • Technical criteria: electrical, HVAC, sprinklers, fire alarm, plumbing and structure, and how each ties into base-building systems
  • Construction rules: approvals, working hours, deliveries, hoarding, insurance, deposits, fines and closeout documents

Not every landlord publishes its package. The examples below come from manuals posted online for two downtown Toronto properties with retail and food court tenants, First Canadian Place (2025) and Bay Adelaide Centre (2021, updated 2024). Your mall's package will differ, so read yours line by line.

What the landlord controls

Lease line out
  • Storefront line, signage limits and the control zone behind it
  • Base-building floors, ceilings and common areas
  • Sprinkler, fire alarm and base-building contractors
  • Working hours, deliveries and hoarding
  • Approval of your drawings, before and during construction

What you control

Lease line in
  • Layout, fixtures and millwork, within the criteria
  • Interior finishes beyond the control zone
  • Your general contractor and most trades
  • Your schedule, inside the landlord's rules
  • Your brand standards, where they fit the criteria

When to ask for it

Ask for the full package before you sign, or at least before your designer starts drawing. Three questions to answer from it right away: which version of the manual applies to your unit, which work must go to the landlord's contractors, and what the landlord charges for reviews, hoarding, deposits and shutdowns. Those answers change your budget more than most finish choices. If the lease is still open, our guide to landlord's work vs. tenant's work explains how to split the base-building items.

02 — Design criteria

Design criteria: storefront, signage and finishes

Design criteria protect the look of the common area. They are specific, and they override brand standards where the two conflict unless the landlord grants a written exception. Examples from the published Toronto manuals:

Sample design and technical criteria from published Toronto tenant manuals (Bay Adelaide Centre 2021/2024; First Canadian Place 2025)
RequirementWhat the criteria sayManual
Storefront openingsNo more than 40% of the storefront widthBay Adelaide Centre
Primary signageNo more than 40% of the storefront length; signs may project up to 4 inchesBay Adelaide Centre
Landlord control zoneFirst 5'-0" from the lease line; hard surfaces such as natural wood, stone or porcelain; no carpet or vinyl tileBay Adelaide Centre
Sales-area finishesNo vinyl or sheet flooring, no acoustical tile ceilings; carpet at least 32 oz where usedBay Adelaide Centre
Food court floorsWaterproof membrane under non-slip finishesBay Adelaide Centre
Coring and cuttingX-ray first, at the tenant's cost; above occupied floors only after 10:00 p.m.First Canadian Place

Deviations need a written request and are approved at the landlord's discretion. Ask early: a refused exception after your fixtures are ordered is expensive.

03 — Technical criteria

Technical criteria: tying into the building

This is where criteria packages quietly add cost. Under the Bay Adelaide Centre criteria, for example:

  • Mechanical, electrical, sprinkler, fire alarm, controls and balancing work must use the landlord's pre-approved contractors
  • Changes to base-building systems, fire detection, fireproofing patches, structure and check meters go to landlord-designated contractors, at the tenant's expense
  • Extra electrical, HVAC or other capacity is charged to the tenant, including incremental capital costs
  • The landlord may send your drawings to its base-building consultants for review, at your cost
  • Food tenants need welded, grease-tight exhaust ductwork to NFPA 96, and grease handling set by the landlord's engineer

Restaurants carry the most technical criteria of any tenant type. If you are opening one, read building a food court restaurant alongside this article.

04 — Approvals

How the tenant criteria package approval works

  1. Preliminary submission

    A complete package with two sample boards. The landlord takes 10 business days to review it.

  2. Final submission

    Five architectural sets plus four mechanical and four electrical. Another 10 working days.

  3. Building permit

    You may file with the City before landlord approval, then send the landlord a copy of the issued permit.

  4. Pre-construction

    Deposit, insurance certificates, a WSIB certificate, the construction schedule and, above $50,000, a Notice of Project filed with the Ministry of Labour.

  5. Construction and closeout

    Work to approved drawings, written approval for any change, then the closeout documents.

Insurance is set by the package too. The 2025 First Canadian Place manual asks the tenant's contractor for $5,000,000 commercial general liability per occurrence and $2,000,000 automobile coverage, and the tenant's consultants for $2,500,000 general liability and $3,000,000 professional liability.

05 — Hidden costs

The costs written into the criteria

Two contractor bids are only comparable if both include the landlord's charges. From the two published manuals:

  • Construction deposit of 3% of construction value: $1,000 minimum in one manual, $5,000 in the other, both capped at $10,000
  • Hoarding installed by the landlord at the tenant's expense
  • Sprinkler drain-down and recharge billed to the tenant, with 72 hours' notice for shutdowns
  • Security supervision for work outside your premises at the tenant's expense
  • Fines: $1,000 per false fire alarm from unannounced work, $500 for leaving a site without fire protection, $500 per occurrence if the landlord has to remove your garbage
Ask for the landlord's charges up front. Before you compare quotes, get the landlord's fee schedule and list of designated contractors, and make sure every bidder prices the same package.

06 — Closeout

Closeout: the 60-day clock

Both manuals split closeout into two deadlines. Before opening: consultant inspection reports, the Certificate of Substantial Performance, sprinkler and fire alarm certificates, the air balancing report and the final ESA certificate. Within 60 days: the City's inspection status letter, a WSIB certificate, as-built drawings, a statutory declaration that suppliers and subcontractors are paid, maintenance agreements and operations manuals. Under the 2025 manual, the deposit is forfeited if the closeout documents are not received within 60 days.

XBuilt builds retail fit-outs and tenant improvements to brand standards and landlord criteria, with permit and inspection coordination and closeout included. For the full pre-construction list, see our retail fit-out checklist. When you have the package, request a quote and send it with your drawings.

FAQ

Tenant criteria FAQ

What is a tenant criteria package?

It is the set of documents a landlord gives tenants that defines what they can build and how: design criteria for storefronts, signage and finishes, technical criteria for connecting to building systems, and construction rules covering hours, contractors, deposits, insurance and closeout.

Can I use my own contractor in a mall?

Usually for most of the work, but not all of it. Published Toronto criteria require landlord-designated or pre-approved contractors for work such as sprinklers, fire alarm, base-building changes and structural work, at the tenant's expense.

How much is a landlord construction deposit?

It varies by landlord. Two published Toronto manuals set it at 3% of the construction value, one with a $1,000 minimum and the other with a $5,000 minimum, both capped at $10,000. One forfeits the deposit if closeout documents are not received within 60 days.

Sources

  1. Bay Adelaide Centre — Retail Tenant Design Criteria (2021, with 2023–2024 updates; posted 2025)
  2. First Canadian Place — Tenant Design & Construction Manual, TDCM100.11 (April 2025)
  3. Government of Ontario — File a work notice (Notice of Project) (2026)

Have a criteria package?

Let’s build
to your landlord’s
criteria.

Send us the criteria package, your drawings and your opening date. We reply to qualified requests the same business day.

+1 (647) 398-9960 info@xbuilt.ca
Your request goes directly to info@xbuilt.ca.